Construction of a section from the exit of tunnel T8 to the Peristeri I/C, Ioannina
Client: AKTOR S.A.
Subject of contract:
- Assembly of the beams on the ground or on trestles according to the plan.
- Tightening of the bolts with a torque wrench.
- Lifting of the assemblies into position.
CONTACT
| Kaslas Industrial Area, Kozani 501 00 | |
| info@mekate.gr | |
| +30 2461021071 |
Important Collaborations

